+33 6 52 81 47 39 [email protected] Mon-Fri 08:00-18:00 (CET)
How To Excel  Master Excel

How To Excel Master Excel

Browse technical resources about OPGW, ADSS, distribution automation, relay protection, fiber sensing, substation networks, line monitoring, and energy internet.

  • How to set up a fiber optic master and slave router

    How to set up a fiber optic master and slave router

    To set up your router for fiber internet quickly, connect the router to your fiber modem, access the router's settings via a web browser, and input the provided ISP credentials. Make sure to update the firmware, configure Wi-Fi security, and customize your network name for. However, setting up a fiber optic connection to your router can seem daunting if you're unfamiliar with the process. Compared to having a home network with a FritzBox router, the Mikrotik router has several advantages including: and less. In this tutorial, we'll show you how to configure a router as a slave. This configuration is very useful if you have a large network or if you need to extend your Wi-Fi signal to an area of ​​your home where it doesn't reach. However, if you're not accustomed to some of the jargon, like MAC cloning and PPPoE, you may encounter a few. Shall I declare the eth2 port as the slave of eth1 and eth1 as the master ? If yes, where can I find the method (in the forum, in a tutorial,. ) ? Note that I didn't use the bridging ! A typical setup is where you have ether1 as your WAN interface. It's master is NONE and it is not a bridge port.

    [PDF Version]
  • How high should a level 3 distribution box be installed off the ground

    How high should a level 3 distribution box be installed off the ground

    Wall-mounted boxes should be 4. This height makes it easy to reach without bending or stretching. Check and fix the box. For the sake of brevity, The National Electrical Code outlines that a breaker box must be installed in an area that provides clearance around the electrical panel. Accessibility A statute from. This article provides an exhaustive examination of the principles and standards governing the height at which electrical panels should be installed, offering readers practical insights grounded in safety, accessibility, and compliance. NEC Article 408. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Check for proper IP/NEMA ratings and material quality. Practice good wiring: secure. Article 110. Editor's Note: read part XIX here One way to help safeguard people from hazards arising from electricity use is to ensure there is sufficient.


  • How to calculate the cost of plastic cable trays

    How to calculate the cost of plastic cable trays

    Ask ten buyers about cable tray cost, and most of them will point to the rate per meter. The real cost shows up later, during installation, during upgrades, and during the first. Wireways and cable trays price structures are dominated by material costs, which account for 60-70% of total project expenses. Steel wireway systems typically fall in the $8-20 per foot range, while aluminum variants command premiums of $12-30 per linear foot due to corrosion resistance properties. That number matters, but it's rarely the one that decides whether a project stays within budget. Whether you're planning a big new build, renovating an existing space, or designing something really specific, understanding how to get precise and timely cable tray costs is key. I'll walk you through how to nail down those prices efficiently, keeping things simple and straightforward.


  • How to connect the grounding wire of the integrated power supply panel

    How to connect the grounding wire of the integrated power supply panel

    Grounding electrode conductor (GEC) – wire connecting the panel to the ground rod. Drive a ground rod into the earth near the panel. Connect the GEC securely to the. This guide will walk you through the process of installing a grounding bar in a Siemens panel, ensuring code compliance and safety. Preparation Safety is paramount. Key steps include driving a ground rod deep into the soil, attaching the grounding wire, connecting it to the panel's grounding. First, panels must have a way to ground all metal components that could be contacted by a person (pretty much all of them). It's the central hub designed to safely channel dangerous fault currents away from your equipment and, more importantly, away from your personnel. You'll learn what tools you need, how to do the job safely, and how to check if everything is working properly.


  • How much does an industrial-grade 10 Gigabit switch cost

    How much does an industrial-grade 10 Gigabit switch cost

    --- Gigabit Ethernet (10/100/1000 Mbps): Switches that support Gigabit Ethernet are now more common in industrial environments, providing faster speeds and higher performance. These 10G industrial switches deliver ultra-fast connectivity with support for 10Gbps data rates, ensuring seamless communication for bandwidth-intensive applications. Our switches come with a standard warranty with 1-year free exchange, 5-year repair, and lifetime maintenance for peace of mind. 10-Gigabit-Switches sind zehnmal schneller als normale Gigabit-Switches. Beim Kauf solltest Du vor allem auf die benötigte Port-Anzahl achten. Die meisten Modelle sind aufgrund ihrer Performance im oberen Preisbereich zu finden. Einen Switch kann man als zentrales Kernelement in einem. The IGS-1000-8T4X features 8 10/100/1000BASE-T ports and 4 1G/2. 5G/10GBASE-X SFP+ fiber optic uplink ports that provide long-distance, high-speed and stable data transmission to a remote core network. Power Requirement: 9-48V DC, 4A max. Note: ALL Industrial Switches do NOT include a power supply.

    [PDF Version]
  • How to connect the grounding to the distribution box

    How to connect the grounding to the distribution box

    Attach a ground wire from one of the threaded studs (A) at the bottom of the housing, to the mounting plate (B). The ground resistance between all system parts shall be < 0. This position is the connection point of the grounding wire in the. Power from factory ground must be installed by a qualified electrician. Each DISTRIBUTION BOX and controller must be grounded. When inspecting the interior of a stainless steel outdoor electrical box distribution box, pay attention to the copper or tin-plated terminals on the base plate or side walls. Make sure all tools are intact to prevent accidents during the grounding.


  • How to connect an 8-port switch with optical ports

    How to connect an 8-port switch with optical ports

    Connect Switch with a corresponding fiber device through a fiber cable, or connect with a Media Converter and change to electrical signal for output. Users could choose to use the SFP fiber port or electrical port of the Switch according to different conditions;Equipped with eight SFP+ ports, two additional SFP28 ports and one RJ45 console port for configuration. With AXIS D8308 Fiber Aggregation Switch you can connect multiple Axis devices using fiber midspans over long distances. Simply put, it defines how network. This article reviews essential features as well as benefits and technical specifications associated with an 8 port sfp optical switch, thus giving you a complete idea of how it works in modern networking environments. Whether you work as an IT professional or have an interest in technology only. This SR8 multimode, parallel, 8-channel transceiver uses two, 4-channel MPO-12/APC optical connectors at 400Gb/s each. The parallel multimode, short reach 8-channel (2xSR4) uses 100G-PAM4 modulation and has a maximum fiber reach of 50-meters using 8 multimode fibers. Cisco Catalyst 1000 Series switches provide support for the.

    [PDF Version]

Need Product Pricing?

Contact us for competitive quotes on any of our power communication and smart grid products

Get a Quote